Drinking water supply network of Anneba - Algeria - Hydraulic - Pumping stations

Drinking water supply network of Anneba - Algeria - Hydraulic - Pumping stations

Client / Owner

  • Ministry of Water Resources
  • Directorate of Hydraulics in the Annaba Wilaya

 

Execution

2004 – 2008

Total costs

1.8 million EUR

Project description

  • The City of Annaba, 3 main municipalities and 14 secondary towns.
  • Targeted population : 500 000 inhabitants
  • 20 km of main rivers plus 20 minor rivers
  • 3 main pumping stations

Services

  • Surveysand data collection
  • Diagnosis and modeling of the flood drainage, treatment and management system
  • Immediate improvement measures
  • Master plan (horizon 2025)
  • Detailed design for the rehabilitation, upgrade and extension of the system
  • Tender documents
  • Complex problems to be addressed: violent hydrology, important solid transfers, very flat urban area with uncontrolled urbanization.
  • The whole process was computer-assisted : GIS, modeling, training of personnel
  • Close coordination with water supply and sanitation studies
  • Supervision of urgent works, planning for improvement works.

Projects you might be interested in…

BG is currently working on over 2000 projects. Discover some other projects you might be interested in...

> All projects