Client
CFF - Infrastructure Lausanne
Execution
2012 - 2015
Total costs
0.9 mio EUR
Project description
Construction of a cut-and-cover tunnel using secant pile walls, with the concrete poured in two phases to permit continuous use of the road.
Intense three-day shutdown of the CFF line to undertake the earthworks in a top-down manner below the existing works; to complete the piled wall; to install the front wall; and to bring the tunnel into service.
Services provided
Phases :
- Scheme design
- Approval process for the plans
- Tender process
- Direction of the works