Choindez tunnel

A16 - Section 8 - Choindez tunnel – Data modelling

Client

  • Republic and Canton of Jura, Switzerland

  • Infrastructure Service (SIN)

Execution

2014 - 2016

Total costs

180 k CHF

Project description

Information modelled:

  • Power: Low voltage and medium voltage
  • Ventilation
  • Lighting
  • Fire detection
  • Traffic
  • Video
  • Emergency telephones
  • Interior electrical installations (lighing and low power)
  • Ventilation, air-conditioning and heating of technical rooms
  • Radio and and emergency network
  • Water network

Services provided

  • Accurate representation of the condition and structure of the installations and equipment in the Choindez tunnel and the above-ground part of section 8.
  • Completion of a tool for the cantonal police department which enables the operation and supervision of the national road network.
  • Completion of an operational tool for maintenance and diagnoses at the maintenance centre at Delémont.

Projects you might be interested in…

BG is currently working on over 2000 projects. Discover some other projects you might be interested in...

> All projects