Client
Hôtel Royal Savoy Lausanne SA
Completion
2013-2014
Contributors
- AHA – New building architect
- Hoffman – Existing building architect
- Hôtel Itten Brechbühl – Site management
Baukosten
> 90 million EUR
Project description
Renovation of the existing Royal Savoy Hotel building and construction of an extension with a swimming pool, spa, fitness centre, and additional rooms. Approximate surface of the complex: 18,000 m2
Air conditioning
- Cold production through a compressor unit
- Distribution of cold water to all consumers (mono-block, fan-coil unit, radiating floor panels)
Heating
- Heat production through a substation connected to the CAS network of Lausanne’s Utilities Company (SIL)
- Heat distribution to all consumers (mono-block, fan-coil unit, radiating floor panels
Ventilation
- All ventilation installations (rooms, reception, conference rooms, kitchens, restaurant, swimming pool)
Plumbing
- Sanitary installations/domestic hot water, softened water, grease interceptor, rain water/waste water
- Plumbing fixtures (showers, bathtubs, sinks)
Electricity
- Lightening protection
- Transformation
- Lighting fixtures
- Outdoor lighting
- Low current installations
Services
- Renovation-extension of the hotel
- Engineering services according to SIA standard 108:
- HVAC
- Plumbing
- Electricity