    Çamlica I Hydroelectric Power Plant Scheme on Zamanti River (Turkey)
  • Çamlica I Hydroelectric Power Plant Scheme on Zamanti River (Turkey)

Çamlica I Hydroelectric Power Plant Scheme on Zamanti River (Turkey)

Client

Ayen Energy Co. Inc., Ankara

Services

(Partnership, BG leading partner)

  • Expertise of the feasibility report and the preliminary studies
  • Final project
  • Construction supervision
  • Technical assistance to the contractor

Project Status

Presently under construction

Scheme Purpose

Hydroelectric energy production

Characteristics

Powerhouse

  • Maximum discharge: 35 m3/s
  • Nominal head: 295 m
  • Installed capacity: 3 x 28 MW
  • Annual production: 429 GWh

Water intake

  • Maximum storage elevation: 1 193,60 m
  • Thalweg elevation: 1 184,30 m
  • 3 settling tanks in parallel: 90 m x 7,5 m

 

 

 

 

 

Headrace tunnel

  • Length: 10 465 m
  • Section: horseshoe
  • Hydraulic diameter: 3,6 m

Penstock

  • Length: 805 m
  • Diameter: 3,25 m to 2,75 m

Click on a city to display our contact information.

 office  office  office  office  office  office  office  office  office  office  office  office  office  office  office  office  office  office  office  office  office  office

Contact

BG Ingénieurs Conseils / BG Ingenieure und Berater / BG Consulting Engineers
Siège / Sitz / Head Office

Avenue de Cour 61
Case postale 241
CH-1001 Lausanne
Tel. +41 58 424 11 11