    Çamlica I Hydroelectric Power Plant Scheme on Zamanti River (Turkey)
  • Çamlica I Hydroelectric Power Plant Scheme on Zamanti River (Turkey)

Çamlica I Hydroelectric Power Plant Scheme on Zamanti River (Turkey)

Client

Ayen Energy Co. Inc., Ankara

Services

(Partnership, BG leading partner)

  • Expertise of the feasibility report and the preliminary studies
  • Final project
  • Construction supervision
  • Technical assistance to the contractor

Project Status

Presently under construction

Scheme Purpose

Hydroelectric energy production

Characteristics

Powerhouse

  • Maximum discharge: 35 m3/s
  • Nominal head: 295 m
  • Installed capacity: 3 x 28 MW
  • Annual production: 429 GWh

Water intake

  • Maximum storage elevation: 1 193,60 m
  • Thalweg elevation: 1 184,30 m
  • 3 settling tanks in parallel: 90 m x 7,5 m

 

 

 

 

 

Headrace tunnel

  • Length: 10 465 m
  • Section: horseshoe
  • Hydraulic diameter: 3,6 m

Penstock

  • Length: 805 m
  • Diameter: 3,25 m to 2,75 m

Click on a city to display our contact information.

Lausanne Geneva London Paris Lyon Aix-les-Bains Marseille Algiers Neuchâtel Fribourg Sion Biel Delémont Bern Schwyz Zug / Baar Zürich Luzern Toulouse Constantine Aarau Turin

Contact

BG Ingénieurs Conseils / BG Ingenieure und Berater / BG Consulting Engineers
Siège / Sitz / Head Office

Avenue de Cour 61
Case postale 241
CH-1001 Lausanne
Tel. +41 58 424 11 11